What the service covers
The network is the layer everything else in the building sits on: servers, accounting systems, cameras, phones, printers, and every employee's connection. When this layer is wrong it rarely announces itself as a network fault. It shows up as recurring slowness, unexplained drops, and hours lost looking for the cause.
So we start at the site, before anything is bought, and come out with a drawing that fixes the number of outlets, their routes and the rack positions — not with a shopping list.
- Site survey and an outlet plan drawn against how the floors and departments are actually used.
- Copper and fibre network cabling run inside proper conduit and trays.
- Rack and patch panel installation, cable management, and labelling at both ends of every run.
- Switch supply and configuration, with VLANs separating departments.
- Wireless coverage planned around floor area and user density, not guesswork.
- Floor-to-floor and building-to-building links, plus the service provider handoff.
- Certification of every outlet with a test instrument, and a report of the results.
- As-built drawing, outlet schedule and device configuration, handed over documented.
How the project runs
When a full network build is the right call
- A new building or an added floor, before the finishing works close the walls.
- A move to new premises with a different footprint or headcount.
- An existing network grown by piecemeal additions until no one can trace a cable.
- Repeated complaints about slowness or dead wireless zones in parts of the building.
- A need to separate guest traffic from work traffic, or to isolate sensitive systems.
The cheapest time to do this is before the finishing works. Once walls and ceilings are closed, every change costs more, takes longer, and sometimes cannot be done without reopening them.
What you receive at handover
Frequently asked questions
How long does an office network take?
It depends on the floor area, the number of outlets, the state of the building, and whether we work before or after the finishing. We put a written timeline in front of you after the site visit and hold to it — we do not quote a duration before seeing the place.
Do you work in existing buildings or only new ones?
Both. In an existing building we start by surveying what is there, decide what can be kept and what has to be replaced, and phase the work to keep disruption down.
Do you supply the hardware, or do I buy it?
Either. We can supply genuine hardware and licenses with invoice and warranty as part of the project, or install and configure equipment you bought yourself.
Fitting out a new building or office?
Tell us the floor area and the number of users, and you get back a first drawing, a bill of materials and an itemised quote.